Engineering Pre Operations

Engineering Department

Town Planning Department

Pre Operations

Engineering Department

New Water Supply Connection (Temporary)

This service is required after plot allotment for construction of building.

New Drainage connection (If required)

This service is required to connect the drainage line from plot to the effluent collection system of MIDC.

No Dues Certificate for water

This No Dues certificate is required for any service to be applied. It is only for inter departmental use. It is issued by respective water bill issuing authority. It certifies that the plot holder is not holding any outstanding water, fire and services charges dues with the MIDC. (This certificate should not be used outside MIDC).
The No Dues Certificate shall be issued within 7 days of the date of application submission on SWC.The No Dues Certificate shall be issued within 7 days of the date of application submission on SWC.
No charges are applicable.
The No Dues Certificate will remain valid till issuance of next month’s Water Bill.

No Objection Certificate Power connection

This service is required for Grant of power connection of required kwh. for Plot No. in Industrial Area.

Application for Completion of drainage Plan

Not Applicable

Water Bill Consumer Portal

This service is required for collecting payment of water bill and other service charges from MIDC consumers as well as collection of Grampanchayat property tax from MIDC consumers and non- consumers.